ISO 9001:2015 Certified · Huangyan, China
Precision
Injection
Molding.
High-volume thermoplastic components with tolerances down to ±0.025 mm. Prototype to 10M+ parts. One-stop service from design to delivery.
Injection Machine Cross-Section // IM-4500T
Avg. Cycle Time
18.4 sec
↓ 2.1s below target
Parts Produced Today
14,832
↑ 4.2% vs yesterday
Defect Rate
0.12 %
↓ 0.03% this week
OEE Score
91.7 %
↓ 1.2% vs last shift
Injection Molding Process
01 / STAGE
Clamping
Mold halves close under high pressure before material injection begins.
450 tons force
02 / STAGE
Injection
Molten plastic injected into cavity at controlled speed and pressure.
240–265°C melt
03 / STAGE
Cooling
Conformal cooling channels solidify the part with minimal warpage.
8–12°C coolant
04 / STAGE
Ejection
Ejector pins push finished part from mold for downstream handling.
8-pin ejector
Process Parameters
Clamp Force
450 Tons
Clamp Speed
60 mm/s
Tie-bar Spacing
750 × 750 mm
Mold Open Stroke
500 mm
Current Status
Active StageClamping
Total Shot Count7,416 cycles
Last Maintenance3 days ago
Tool Life Remaining92,584 shots
Material Library
Polypropylene
PP // HOMOPOLYMER
Melt Temp220–280°C
Density0.905 g/cm³
Shrinkage1.2–1.8%
Tensile35 MPa
ABS
ACRYLONITRILE BUTADIENE STYRENE
Melt Temp200–250°C
Density1.05 g/cm³
Shrinkage0.4–0.7%
Tensile43 MPa
Nylon 66
PA66 // POLYAMIDE
Melt Temp260–290°C
Density1.14 g/cm³
Shrinkage0.8–1.5%
Tensile82 MPa
Polycarbonate
PC // OPTICAL GRADE
Melt Temp280–320°C
Density1.20 g/cm³
Shrinkage0.5–0.7%
Tensile60 MPa
POM / Acetal
POM-C // COPOLYMER
Melt Temp190–210°C
Density1.41 g/cm³
Shrinkage1.8–2.2%
Tensile67 MPa
PEEK
POLYETHER ETHER KETONE
Melt Temp370–400°C
Density1.32 g/cm³
Shrinkage0.9–1.1%
Tensile100 MPa
Cycle Time Estimator
Enter Part Parameters
2.0 mm
g
50°C
cavities
Estimated Results
Cooling Time9.8s
Fill Time1.4s
Total Cycle Time18.2s
Parts / Hour793
Parts / Day (22 hr)17,451
Want an exact quote?
Our engineers will give you a precise cycle time and cost estimate within 24 hours.
Request Free Quote →Live Machine Status
Running
UNIT // IM-01
Engel Victory 450
Cycle
18.4s
Efficiency
94.2%
Material
PP HM12N
Shift Parts
4,912
Shift Progress82%
Running
UNIT // IM-02
Arburg Allrounder 720S
Cycle
22.1s
Efficiency
88.7%
Material
ABS HH106
Shift Parts
3,644
Shift Progress67%
Setup
UNIT // IM-03
Krauss Maffei 220
Next Run
14:30
Material
PA66 GF30
Setup Progress45%
Running
UNIT // IM-04
Husky HyPET 300
Cycle
12.8s
Efficiency
97.1%
Material
PET CV
Shift Parts
6,276
Shift Progress91%
Maintenance
UNIT // IM-05
Sumitomo 180T
Downtime
2.5 hrs
ETA Online
17:00
Repair Progress60%
Running
UNIT // IM-06
Demag IntElect 500
Cycle
31.2s
Efficiency
91.3%
Material
PC GE240
Shift Parts
1,500
Shift Progress55%
Ready to Start Your Project?
Send us your design files and get an accurate quote within 24 hours. Our engineers are ready to review your part and recommend the best tooling strategy.